The installation of the House Container is similar to the building building. The surrounding and partition wall foundations are flattened to use reinforced concrete, which is relatively strong; then the columns are connected with a horizontal beam, the upper parts, the exterior wall board and the doors and windows frames; follow the pavement.
The floor, then set up a layer, and then go to the roof and the roof panel; then install the doors and windows, etc. to pull the vertical support. There are sanitary ware, small hardware and the like. The hidden project of the House Container refers to the concealment of the next process after completing the previous process during construction. No good, no matter how beautiful the surface is, it is futile.
In the process of installation, all details cannot be ignored. If any details have problems, they may bring serious economic losses, and even cause damage to personal safety. Therefore, in the process of installation of House Containers, people must carefully check each link, so as to avoid unnecessary economic losses and various troubles and damage.
Kommentar
(0)